Hydrodemolition in Civil engineering
When renovating civil structures, the original reinforcement must be preserved. Using high-pressure water of up to 2,500 bar, VTG selectively removes only the damaged concrete.

Reinforcement-preserving removal for infrastructure
Bridges, viaducts and tunnels require repair in which the reinforcement and structural integrity are fully preserved. Hydrodemolition uses water at pressures of up to 2,500 bar to selectively remove damaged concrete. No vibrations, no micro-cracks, no risk to the surrounding structure.

Hans van 't Geloof
Hans van 't Geloof
Contact us
Our specialists would be happy to discuss the possibilities for your project.